BID NO 15/2022 (RE-INVITE): : SUPPLY, DELIVERY AND INSTALLATION OF A BAG-IN-BOX CARTONER FOR WINE

Location:

Brackenfell, Western Cape

Post Date:

2022-10-24 09:35:31

Closing Date:

2022-11-07

Contact Person:

Contact Email:

mpienaar@casidra.co.za

Uploads disabled

Tender Details

BID DOCUMENT DOWNLOAD LINK:
BID 15/2022 (Re-invite)

 

BID NO 15/2022 (RE-INVITE) – LA RICMAL: SUPPLY, DELIVERY AND INSTALLATION OF A BAG-IN-BOX CARTONER FOR WINE, BRACKENFELL INDUSTRIAL

This document is not for sale. Any entity that requests payment must be reported at the contact person indicated in this tender.

GENERAL REQUIREMENTS

A service provider with proven knowledge and expertise as a supplier of Bag-in-Box (BIB) Cartoner supply, delivery and installation is required for an Agri-Processing project funded by the Western Cape Department of Agriculture.

Conditions that may pose a risk: (Summary of Risk analysis)

The typical conditions that are associated with manufacturing, transport and installation of Bag-in-Box Cartoners can be expected on this project.

All technical enquiries can be referred to Mr Michael Pienaar at (021) 863 5000 or 082 387 0119.

The scope of works will include:

  1. Manufacturing of a Bag-in-Box Cartoner.
  2. Transportation of the Bag-in-Box Cartoner to Brackenfell (Co-ordinates: 33°51’43.4″S 18°41’59.2″E).
  3. Installation of the Bag-in-Box Cartoner at the warehouse.

Documents for the purpose of this bid include:

  1. Conditions to Submit Bid (Form CBD 2.1 (Lump Sum)
  2. Price Form, Bill of Quantities and Schedules (Form CBD 3.1 (Lump Sum))
  3. Scope of Works (Form CBD 4)
  4. PPP Evaluation Form (Form CBD 5.1 (80/20))
  5. Bank Entity Form (Form CBD 7), unless the banking details of the company indicate “verified” on the Central Supplier Database (CSD).
  6. Registration on the CSD for all suppliers is compulsory and registration numbers must be supplied.

 In accordance with Casidra’s Preferential Procurement Policy, this bid as further indicated in CBD 5.1 is subject to:

  • a functionality compliance test;
  • B-BBEE certified bids will receive preferential scores;

The successful bidder will be required to fill in and sign a written Contract Form (CBD 8). Included are a penalty clause of R 500/calendar day that apply for late completion of works and a 10% retention fee for 3 months not bearing interest.

BID DEADLINE:  The closing date for the bid is 7 November 2022 strictly at 12H00.

SUBMISSION OF BIDS

Bids must be submitted in a sealed envelope with the name of the bidder and the inscription “LA RICMAL: SUPPLY, DELIVERY AND INSTALLATION OF A BAG-IN-BOX CARTONER FOR WINE, BRACKENFELL – BID NO. 15/2022 (RE-INVITE)” and placed in the bid box available at Reception of Casidra’s Head Office, 22 Louws Avenue, Southern Paarl.  No faxed, emailed, counter-to-counter courier or posted bids will be accepted.

The following documents (including fully completed and signed CBD forms numbered 1 to 7 as supplied) must be valid for a period of 90 calendar days after closure of the bid and submitted as a bid packet:

Document number

Document description

Action required/comment 

CBD 1

General requirements

Signed

CBD 2.1

Conditions to submit bid

Signed

CBD 3.1

Price form (lump sum)

Complete, sign

CBD 3.1 Experience

Proof of previous work and contact details of three work-related references that are qualified to comment on work.

Compulsory

CBD 3.1 Rates

Unit rates for the works on the forms as supplied

Compulsory

CBD 3.1 Changes

Indication if any changes are proposed in scope of works and cost implication.

If required

CBD 4

Scope of works

Signed

CBD 5.1 (80/20)

PPP Evaluation form

Complete, sign

CBD 7

Bank Entity form (Not needed if “verified” on CSD

Complete, bank stamp

TCC of principle and sub-contractors

Registration and verification of Tax Clearance on CSD.

Compulsory

BEE

B-BBEE Certificate or Sworn Affidavit (as applicable, see CBD 5 for detail)

Original affidavit or certified copy certificate/Valid/not compulsory

Company profile

Detailed company profile including the core competencies of personnel and subcontractors

Compulsory

COIDA

Letter of good standing of the Contractor in terms of COIDA

Valid/ compulsory

Warranty

Attach the 12-month warranty offered on the product and service

Compulsory

Brochure

Attach the brochure describing the technical specifications of the product

Compulsory