+27(0)21 863-5000 tender@casidra.co.za

RFQ FOR SUPPLY & INSTALLATION OF 1.74HA SPRINKLER IRRIGATION SYSTEM

Location:

North West Coast District, Western Cape

Post Date:

Closing Date:

2022-04-12

Contact Person:

Contact Email:

mnemutudi@casidra.co.za

Uploads disabled

Tender Details

RFQ DOCUMENT DOWNLOAD LINK: RFQ SPRINKLER IRRIGATION SYSTEM

 

RFQ FOR SUPPLY & INSTALLATION OF 1.74HA SPRINKLER IRRIGATION SYSTEM

This document is not for sale. Any entity that requests payment must be reported at the contact person indicated in this tender.

GENERAL REQUIREMENTS

The works, as described, are part of the Agriculture and Land Reform programme of the Department of Agriculture Western Cape for the North West coast district. Ebenhaeser is situated on approximately 45km North-west from Vredendal. The quoted amount will be a lump sum bid and must include supply and installation of a sprinkler system.

Conditions that may pose a risk: (Summary of Risk analysis)

Trenches with a depth of 600mm will be excavated. To work under these conditions, the Contractor must take all necessary precautions.

Contact person:

All technical inquiries can be referred to M Nemutudi at 082 781 5855 / 021 863 5000.

The scope of works will include:

  1. Supply & installation of 1.74 ha sprinkler irrigation system, as described in CBD 4 (scope of works).

Documents for the purpose of this bid include:

  1. Conditions to Submit Bid (Form CBD 2.1 (Lump Sum))
  2. Price Form, Bill of Quantities and Schedules (Form CBD 3.1 (Lump Sum)
  3. Scope of Works (Form CBD 4)
  4. PPP Evaluation Form (Form CBD 5.1 (80/20))
  5. Bank Entity Form (Form CBD 7), unless the banking details of the company indicate “verified” on the Central Supplier Database (CSD).
  6. Registration on the CSD for all suppliers is compulsory and registration numbers must be supplied.
  7. Drawings (Irrigation Layout x 1; Block 1 ,2 & 3 Cluster sketches)
  8. For Construction works – Occupational Health and Safety Risk assessment and Specifications according to Construction Reg. 5 (b)

 In accordance with Casidra’s Preferential Procurement Policy, this bid as further indicated in CBD 5.1 is subject to:

  • a functionality compliance test;
  • B-BBEE certified bids will receive preferential scores;
  • Local production and content

This bid include goods from a designated sector Valves, actuators, taps and stop cocks and only locally produced goods, services or works, or locally manufactured goods with a stipulated minimum threshold for local production and content will be considered. SBD 6.2 and Annex C, D and E documentation apply and must be completed and handed in with this bid.

 The successful bidder will be required to fill in and sign a written Contract Form (CBD 8). Included are a penalty clause of R 500.00/calendar day that apply for late completion of works and a 10% retention fee for 3 months not bearing interest.

BID DEADLINE:  The closing date for the bid is 12 April 2022 strictly at 12H00.

SUBMISSION OF BIDS

Fully completed bids can be e-mailed to mnemutudi@casidra.co.za before the closing date.

The following documents (including fully completed and signed CBD forms numbered 1 to 7 as supplied) must be valid for a period of 90 calendar days after closure of the bid and submitted as a bid packet:

Document number

Document description

Action required/comment

CBD 1

General requirements

Signed

CBD 2.1

Conditions to submit a bid (lump sum)

Signed

CBD 3.1

Price form (lump sum)

Complete, sign

CBD 4

Scope of works

Signed

CBD 5.1 (80/20)

PPP Evaluation form

Complete, sign

CBD 7

Bank Entity Form (Not needed if “verified” on CSD)

Complete, bank stamp

TCC of principle and sub-contractors

Registration and verification of Tax Clearance on CSD.

Compulsory

BEE

B-BBEE Certificate or Sworn Affidavit (as applicable, see CBD 5 for detail)

An original affidavit or certified copy certificate/Valid/not compulsory

Company Profile

Detailed company profile including the core competencies of personnel and subcontractors

Compulsory

CBD 3.1 Experience

Proof of previous work and contact details of three work-related references that are qualified to comment on work.

Compulsory

CBD 3.1 Rates

Unit rates for the works on the forms as supplied

Compulsory

CBD 3.1 Changes

Indication if any changes are proposed in the scope of works and cost implications.

If required

CBD 3.1 Detailed Company Profile

Detailed company profile including the core competencies of personnel and subcontractors

Compulsory

CBD 3.1 Guarantee

Signed 12 Month Guarantee on the completed works.

Compulsory

CBD 3.1 COIDA

Letter of good standing of the Contractor in terms of COIDA

Compulsory

SBD 6.2

Signed SBD 6.2 and Annexure C

Compulsory

OHS Plan

Occupational Health and Safety Plan approved by the Client

Valid/ Proof after the appointment

CI

Proof of construction insurance

Valid/ Proof after the appointment