+27(0)21 863-5000 tender@casidra.co.za

RFQ: PROFESSIONAL SERVICES: HEALTH & SAFETY CONTROL OFFICER

Location:

Genadendal, Western Cape

Post Date:

Closing Date:

2022-06-17

Contact Person:

Contact Email:

mpienaar@casidra.co.za

Uploads disabled

Tender Details

RFQ DOCUMENT DOWNLOAD LINK: RFQ PROFESSIONAL SERVICES

 

RFQ: PROFESSIONAL SERVICES:HEALTH & SAFETY CONTROL OFFICER

This document is not for sale. Any entity that requests payment must be reported at the contact person indicated in this tender.

The works, as described, is part of the Disaster Management Programme for the Baviaans River situated in Genadendal, Western Cape.

The scope of works which the H&S officer will need to supervise entails the construction of 29 (twenty-nine) gabion structures (groynes) in the Baviaans River over an approximate distance of 1300 metres.

The works must be completed within a 10-month contract period.

Conditions that may pose a risk: (Summary of Risk analysis)

Flood conditions may arise in the river. Sandy ground conditions can be expected, the construction site is situated in a riparian zone.

We therefore hereby request you/your firm to provide us with a quotation for the following:

  1. Approval of Contractor’s H&S plan.
  2. Monthly inspections of the works with reports to Engineer.
  3. Supervision and monitoring of the appointed contractor to successful completion regarding H&S concerns.
  4. The attendance of a compulsory monthly site meeting.
  5. One close-out meeting will also be held.
  6. Allow for 12 meetings.

All enquiries can be referred to Mr Michael Pienaar at (021) 863 5000 or 082 387 0119.

Documents for the purpose of this bid include:

  1. Price Form, Bill of Quantities and Schedules (Form CPBD 3.1 (Lump Sum)
  2. Scope of Works (Form CPBD 4)
  3. PPP Evaluation Form (Form CPBD 5.1 (80/20))
  4. Bank Entity Form (Form CPBD 7), unless the banking details of the company indicate “verified” on the Central Supplier Database (CSD).
  5. Registration on the CSD for all suppliers is compulsory and registration numbers must be supplied.

In accordance with Casidra’s Preferential Procurement Policy, this bid as further indicated in CBD 5.1 is subject to:

  • a functionality compliance test;
  • B-BBEE certified bids will receive preferential scores;

BID DEADLINE:  The closing date for the bid is 17 June 2022 strictly at 12H00.

SUBMISSION OF BIDS

Bids must be submitted in a sealed envelope with the name of the bidder and the inscription “RFQ – BAVIAANS RIVER: CONSTRUCTION OF EROSION PROTECTION STRUCTURES IN BAVIAANS RIVER, GENADENDAL” and placed in the bid box available at Reception of Casidra’s Head Office, 22 Louws Avenue, Southern Paarl.  No faxed, emailed, counter-to-counter courier or posted bids will be accepted.

The following documents (including fully completed and signed CPBD forms numbered 1 to 7 as supplied) must be valid for a period of 90 calendar days after closure of the bid and submitted as a bid packet:

Document number

Document description

Action required/comment 

CPBD 1

General requirements

Signed

CPBD 3.1

Price form (lump sum)

Complete, sign

CPBD 3.1 Experience

Proof of previous work and contact details of three work-related references that are qualified to comment on work.

Compulsory

CPBD 3.1 Rates

Unit rates for the works on the forms as supplied

Compulsory

CPBD 3.1 Changes

Indication if any changes are proposed in scope of works and cost implication.

If required

CPBD 3.1 H&S Officer CV

Proof of competency of a H&S Officer in terms of the Construction regulation 8.

Valid/ compulsory

CPBD 4

Scope of works

Signed

CPBD 5.1 (80/20)

PPP Evaluation form

Complete, sign

CPBD 7

Bank Entity form (Not needed if “verified” on CSD)

Complete, bank stamp

TCC of principle and sub-contractors

Registration and verification of Tax Clearance on CSD.

Compulsory

BEE

B-BBEE Certificate or Sworn Affidavit (as applicable, see CPBD 5 for detail)

Original affidavit or certified copy certificate/Valid/not compulsory

Company profile

Detailed company profile including the core competencies of personnel and subcontractors

Compulsory

COIDA

Letter of good standing of the Contractor in terms of COIDA

Valid/ compulsory

SACPCMP Registration

Registration Certificate with SACPCMP as a Construction Health and Safety Officer.

Valid/compulsory