RFQ – WELLINGTON: EIKEDAL INDIGENOUS FARMING: SUPPLY, DELIVERY & ASSEMBLY OF FARMING EQUIPMENT
This document is not for sale. Any entity that requests payment must be reported at the contact person indicated in this tender.
GENERAL REQUIREMENTS
The works, as described, is required on a farm in Wellington, Cape Winelands District Municipality. The quoted amount will be a lump sum bid and must include supply, delivery and assembly. The successful bidder must have the capacity to start the works within 7 (seven) days of appointment.
Equipment must be delivered to Farm 1249 Eikedal Estate, situated in Wellington, Western Cape.
Conditions that may pose a risk: (Summary of Risk analysis)
There are few risks relating to this task. It is expected that the machinery be supplied, transported and assembled cautiously and timeously to the designated client, without posing any threat to the physical integrity of the machinery. The supplier must put all necessary precautions in place to work under these conditions.
The scope of works will include:
- Supply, delivery and assembly of a Landini Solis Tractor (or similar)
- Supply, delivery and assembly of a 3ton Tipper Trailer
- Supply, delivery and assembly of an S-Tine Tiller (or similar)
- Supply, delivery and assembly of an Agrose Mounted Field-Sprayer (or similar)
- Supply, delivery and assembly of a Mounted Offset Disc Harrow
- Price to include transportation, installation and accommodation costs.
- At least 1 year (12 months) Warranty
- 3 months after-sale service plan
- Supplier must verify the design specifications as given here.
All technical inquiries can be referred to Mr C Cupido at 021 863 5000.
Documents for the purpose of this bid include:
- Conditions to Submit Bid (Form CBD 2.1 (Lump Sum / Measured)) or Standard Conditions of Contract can be viewed on the Casidra website at www.casidra.co.za.
- Price Form, Bill of Quantities and Schedules (Form CBD 3.1 (Lump Sum/Measured))
- Scope of Works (Form CBD 4)
- PPP Evaluation Form (Form CBD 5.1 (80/20) / 5.2 (90/10))
- Bank Entity Form (Form CBD 7), unless the banking details of the company indicate “verified” on the Central Supplier Database (CSD).
- Registration on the CSD for all suppliers is compulsory and registration numbers must be supplied.
In accordance with Casidra’s Preferential Procurement Policy, this bid as further indicated in CBD 5.1/5.2 is subject to:
- A functionality compliance test;
- B-BBEE certified bids will receive preferential scores;
The successful bidder will be required to fill in and sign a written Contract Form (CBD 8). Included are a penalty clause of R 500.00/calendar day that apply for late completion of works and a 10% retention fee for 3 months not bearing interest.
BID DEADLINE: The closing date for the bid is 3 March 2023 strictly at 12H00.
SUBMISSION OF BIDS
All RFQ documents to be uploaded onto the Casidra RFQ/Tender portal. No e-mailed or hard copy documents will be accepted.
NOTE TO BIDDERS:
Bidders are required to ensure that electronic bid submissions are done at least a day before the closing date to prevent issues which they may encounter due to their internet speed, bandwidth or the size of number of uploads they are submitting. Please do not wait for the last your to submit. A bidder can upload 30MB and up to 10 documents per upload and multiple uploads are permitted.
The following documents (including fully completed and signed CBD forms numbered 1 to 7 as supplied) must be valid for a period of 90 calendar days after closure of the bid and submitted as a bid packet:
Document number | Document description | Action required/comment |
CBD 1 | General requirements | Signed |
CBD 2.1 | Conditions to submit bid | Signed |
CBD 3.1 | Price form (lump sum/measured) | Complete, sign |
CBD 3.1 Experience | Proof of previous work and contact details of three work-related references that are qualified to comment on work. | Compulsory |
CBD 3.1 Changes | Indication if any changes are proposed in scope of works and cost implication. | If required |
CBD 5.1 (80/20) | PPP Evaluation form | Complete, sign |
CBD 7 | Bank Entity form (Not needed if “verified” on CSD) | Complete, bank stamp |
TCC of principle and sub-contractors | Registration and verification of Tax Clearance on CSD. | Compulsory |
BEE | B-BBEE Certificate or Sworn Affidavit (as applicable, see CBD 5 for detail) | Original affidavit or certified copy certificate/Valid/not compulsory |
Company profile | Detailed company profile including the core competencies of personnel and subcontractors | Compulsory |
Warranty | Provide copy of 1 year warranty offered | Compulsory |
After Sale Service | Provide 3 month after sale service | Compulsory |
Product brochure | Supply brochure & technical specifications of product offered | Compulsory |