RFQ:CONSTRUCTION OF A GABION RETAINING EMBANKMENT

Location:

Cape Town, Western Cape

Post Date:

Closing Date:

2022-05-31

Contact Person:

Contact Email:

mpienaar@casidra.co.za

Uploads disabled

Tender Details

RFQ DOCUMENT DOWNLOAD LINK: CONSTRUCTION OF GABION RETAINING EMBANKMENT

 

RFQ: ORANJEZICHT PROJECT – CONSTRUCTION OF A GABION RETAINING EMBANKMENT

This document is not for sale. Any entity that requests payment must be reported at the contact person indicated in this tender.

GENERAL REQUIREMENTS

A service provider with proven knowledge and expertise in gabion retaining wall construction is required to construct a retaining embankment.

Conditions that may pose a risk: (Summary of Risk analysis)

The contractor is to put all the necessary precautions in place to work on a stabilization construction project on an embankment.  

The scope of works will include:

  1. Construction of a retaining structure using gabions in Oranjezicht, Cape Town.

Documents for the purpose of this request for quotation include:

  1. Price Form, Bill of Quantities and Schedules (Form CBD 3.1 (Measured))
  2. Scope of Works (Form CBD 4)
  3. PPP Evaluation Form (Form CBD 5.1 (80/20))
  4. Local Content Declaration Form (SBD 6.2)
  5. Registration on the CSD for all suppliers is compulsory and registration numbers must be supplied.
  6. Gabion Specification required for this project.

In accordance with Casidra’s Preferential Procurement Policy, this bid as further indicated in CBD 5.1 is subject to:

  • a functionality compliance test;
  • B-BBEE certified bids will receive preferential scores;
  • Local production and content

This bid includes goods from a designated sector 1) Steel products and only locally produced goods, services or works, or locally manufactured goods with a stipulated minimum threshold for local production and content will be considered. SBD 6.2 and Annex C, D and E documentation apply and must be completed and handed in with this bid.

The successful bidder will be required to fill in and sign a written Contract Form (CBD 8). Included are a penalty clause of R 500/calendar day that apply for late completion of works and a 10% retention fee for 3 months not bearing interest.

There is a compulsory site meeting on 12 May 2022 at 13:00 at the Oranjezicht Garden, GPS Co-ordinates: 33°56’32.1″S 18°24’53.0″E

Please RSVP for this meeting to mpienaar@casidra.co.za

BID DEADLINE:  The closing date for the bid is 31 May 2022 strictly at 12H00.

All technical enquiries can be referred to Mr M Pienaar at (021) 863 5000 or 082 387 0119.

SUBMISSION OF BIDS

RFQ documents must only be e-mailed, and the process below must be followed:

  • Bids to be e-mailed in PDF format.
  • Bids to be e-mailed to the following e-mail address: mpienaar@casidra.co.za
  • Bidders to note that the maximum size of our mailbox is 6 MB.
  • Casidra will not be responsible for bidder’s internet connection, problems with e-mails, etc.
  • This bid has a specific closing date and time. Any submissions that reach our mailbox after this time will be considered as late, regardless of the time it was sent. Therefore, please submit bids timeously.
  • Bids must be e-mailed with the following heading: “RFQ: ORANJEZICHT PROJECT – CONSTRUCTION OF A RETAINING EMBANKMENT”.

No faxed, counter-to-counter or posted bids will be accepted.

The following documents (including fully completed and signed CBD forms numbered 1,3,4 and 5 as supplied) must be valid for a period of 90 calendar days after closure of the bid and submitted as a bid packet:

Document number

Document description

Action required/comment 

CBD 1

General requirements

Signed

CBD 3.1

Price form (lump sum)

Complete, sign

CBD 3.1 Experience

Proof of previous work and contact details of three work-related references that are qualified to comment on work.

Compulsory

CBD 3.1 Rates

Unit rates for the works on the forms as supplied

Compulsory

CBD 3.1 Changes

Indication if any changes are proposed in scope of works and cost implication.

If required

CBD 4

Scope of works

Signed

CBD 5.1 (80/20)

PPP Evaluation form

Complete, sign

SBD 6.2

Signed SBD 6.2 and relevant Annexures

Complete, sign

TCC of principle and sub-contractors

Registration and verification of Tax Clearance on CSD.

Compulsory

B-BBEE

B-BBEE Certificate or Sworn Affidavit (as applicable, see CBD 5 for detail)

Original affidavit or certified copy certificate/Valid/not compulsory

Company profile

Detailed company profile including the core competencies of personnel and subcontractors

Compulsory

Method Statement

Method Statement of how the work will be executed.

Compulsory

COIDA

Letter of good standing of the Contractor in terms of COIDA

Valid/ compulsory