GENERAL REQUIREMENTS
The works, as described, the project is situated on a farm which is approximately 14 Kilometres from Robertson Town direction to Ashton. The T-Junction at Agteriedam Padstal you turn left. The project is just after Assegai Rest Klaasvoogds.
This project consists of the following elements:
- New Processing Facility
- Upgrading Ablution Facilities
Below is a general description of the works and detailed specifications of each section will be highlighted under each respective various sections of part A and B.
GENERAL DESCRIPTION PART A – NEW PROCESSING FACILITY
- Construction of a steel structure of 9 metres wide by 15 metres long. Roof sheets, side and gable ends cladding are including.
- The construction of a 150mm thick reinforced concrete floor.
- The construction of insulated panelling on top of the concrete floor
- All painting of a steel portal frame building. All fixing methods are not to be welded where possible, due to design being such that the steel frame can be moved to another location.
- The price must include all supply and transport of materials to and from site.
GENERAL DESCRIPTION PART B – UPGRADE OF EXISTING ABLUTION FACILITY
- Renovation of an existing building, both internally and externally
- New plumbing facilities
The quoted amount will be a lump bid and must include labour, material and machinery. The successful bidder must have the capacity to start the works within 7 (seven) days of appointment.
Compulsory site meeting
- Date and Time: Tuesday 13 October 2026 @11:00
- Google Maps link: https://maps.app.goo.gl/QHwpd3YTCEAH5oi8A